1.现代电力系统仿真控制与绿色电能新技术教育部重点实验室(东北电力大学),吉林 吉林 132012; 2.国网吉林省电力有限公司,吉林 长春130021
国家重点研发计划项目资助(2022YFB2404000)
1. Key Laboratory of Modern Power System Simulation and Control & Renewable Energy Technology, Ministry of Education (Northeast Electric Power University), Jilin 132012, China; 2. State Grid Jilin Electric Power Co., Ltd., Changchun 130021, China
李本新,高 洋,孙 勇,等.冰灾下考虑故障动态演变的配电网移动储能灾前预布局策略[J].电力系统保护与控制,2025,53(11):170-180.[LI Benxin, GAO Yang, SUN Yong, et al. Pre-disaster mobile energy storage pre-deployment strategy for distribution networks considering time-varying faults under ice disasters[J]. Power System Protection and Control,2025,V53(11):170-180]