1.梯级水电站运行与控制湖北省重点实验室(三峡大学),湖北 宜昌 443002;2.国家电网有限公司,北京 100031;3.中国电力科学研究院有限公司,北京 100192
国家电网有限公司科技项目资助(5108-202355040A-1-1-ZN)
1. Hubei Provincial Key Laboratory for Operation and Control of Cascaded Hydropower Station (China Three GorgesUniversity), Yichang 443002, China; 2. State Grid Corporation of China, Beijing 100031, China;3. China Electric Power Research Institute, Beijing 100192, China
杨 楠,产雪振,张 志,等.台风灾害下考虑源-网-荷协同优化的SCUC复合决策方法[J].电力系统保护与控制,2025,53(10):33-44.[YANG Nan, CHAN Xuezhen, ZHANG Zhi, et al. A composite SCUC decision-making method considering source-network-load collaborative optimization in typhoon disasters[J]. Power System Protection and Control,2025,V53(10):33-44]
复制
