1.贵州大学电气工程学院,贵州 贵阳 550025;2.贵州电网有限责任公司电网规划研究中心,贵州 贵阳 550025
国家自然科学基金项目资助(52367005)
1. College of Electrical Engineering, Guizhou University, Guiyang 550025, China; 2. Power Grid Planning and Research Center of Guizhou Power Grid Co., Ltd., Guiyang 550025, China
郎学毅,汤亚芳,熊 炜,等.适应于逆变型风电接入系统的改进故障序分量选相方法[J].电力系统保护与控制,2024,52(7):89-97.[LANG Xueyi, TANG Yafang, XIONG Wei, et al. An improved fault sequence component phase selection method adapted to an inverter-interfaced wind farm access system[J]. Power System Protection and Control,2024,V52(7):89-97]
复制
