基于小波KPCA与Bi-LSTM的特高压换流站测控装置健康评估和预测
CSTR:
作者:
作者单位:

(1.国网浙江省电力有限公司金华供电公司,浙江 金华 321000;2.上海电力大学,上海 200090)

作者简介:

吕大青(1973—),男,硕士,高级工程师,主要研究方向为电力工程及设备的设计及安装调试,新能源发电技术。E-mail: 478090368@qq.com 杨欢红(1965—),女,硕士,副教授,硕士生导师,主要研究方向为电力系统优化调度与控制,可再生能源发电技术。E-mail: yanghuanhong0907@163.com

通讯作者:

中图分类号:

基金项目:

国家自然科学基金项目资助(51777119)


Health status assessment and prediction of operational condition of a measurement and control device in a UHV converter station based on KPCA and Bi-LSTM
Author:
Affiliation:

(1. Jinhua Power Supply Company, State Grid Zhejiang Electric Power Co., Ltd., Jinhua 321000, China; 2. Shanghai University of Electric Power, Shanghai 200090, China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    特高压换流站测控装置作为模拟量非线性、传输转换高要求的二次设备,目前的评估和预测方法不完全适用于测控装置的健康分析。提出了一种基于小波核主元(kernel principal component analysis, KPCA)分析和双向长短期记忆网络(bi-directional long short-term memory, Bi-LSTM)结合的健康评估和预测方法。通过引入小波核函数,以提高KPCA对健康状态影响因素进行特征提取的能力。通过第一核主元建立健康指数,以评估测控装置状态变化。通过构建Bi-LSTM网络模型以输入特征信息达到健康预测目的。以浙江某换流站采集到的真实数据作为样本,通过实验数据进行了对比分析。结果表明,该方法可以提升多维健康监测数据的准确评估和预测精度,为检修人员制定检修策略提供科学参考。

    Abstract:

    The measurement and control device of a UHV converter station is a piece of secondary equipment with nonlinear analog and high requirements for transmission and conversion. The current evaluation and prediction methods are not fully suitable for the analysis of such a device. A health assessment and prediction method based on wavelet kernel principal component analysis (KPCA) and a bidirectional long-term and short-term memory network (Bi-LSTM) is proposed. The wavelet kernel function is introduced to improve KPCA's feature extraction of influencing factors on the state of health. A health index is established through the first nuclear principal component to evaluate the state change of the device. The purpose of health prediction is achieved by constructing a Bi-LSTM network model to input characteristics information. Taking the real data collected by a converter station in Zhejiang as the sample, the experimental data are compared and analyzed. The results show that this method can improve the accurate evaluation and prediction accuracy of multidimensional health monitoring data, and provide a scientific reference for maintenance personnel in formulating maintenance strategies. This work is supported by the National Natural Science Foundation of China (No. 51777119).

    参考文献
    相似文献
    引证文献
引用本文

吕大青,杨欢红,杜浩良,等.基于小波KPCA与Bi-LSTM的特高压换流站测控装置健康评估和预测[J].电力系统保护与控制,2022,50(19):80-87.[LÜ Daqing, YANG Huanhong, DU Haoliang, et al. Health status assessment and prediction of operational condition of a measurement and control device in a UHV converter station based on KPCA and Bi-LSTM[J]. Power System Protection and Control,2022,V50(19):80-87]

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2022-02-08
  • 最后修改日期:2022-07-03
  • 录用日期:
  • 在线发布日期: 2022-09-30
  • 出版日期:
文章二维码
关闭
关闭