分时电价下考虑储能调度因素的短期负荷预测模型
CSTR:
作者:
作者单位:

(1.东北电力大学电气工程学院,吉林 吉林 132012;2.中国南方电网有限责任公司肇庆供电局,广东 肇庆 526000)

作者简介:

李卫国(1970—),男,硕士,副教授,研究方向为电气设备状态监测研究;E-mail:1677493048@qq.com
陈立铭(1993—),男,硕士研究生,研究方向为电力系统短期负荷预测、需求响应;E-mail:1875155399@qq.com
张 师(1989—),男,硕士,助理实验师,研究方向为电力系统规划。E-mail:zs472254835@qq.com

通讯作者:

中图分类号:

基金项目:

国家电网公司科技项目资助(SGTJDK00DWJS1700034)“面向随机性电源的多元负荷主动响应及预测控制技术研究与应用”


Short-term load forecasting model considering energy storage scheduling factors under time-sharing price (1. School of Electrical Engineering, Northeast Electric Power University, Jilin 132012, China;
Author:
Affiliation:

LI Weiguo1, CHEN Liming1, ZHANG Shi1, XU Bei2, WANG Xuguang1, LIU Hongwei1 ;2. Zhaoqing Power Supply Company, China Southern Power Grid Co., Ltd., Zhaoqing 526000, China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    影响电力系统短期负荷预测的因素有多种,因此在进行短期负荷预测时,考虑的因素种类越多,预测的精度越高。在考虑环境因素的基础上,构建分时电价下考虑储能调度因素的改进鲸鱼算法优化Elman神经网络模型。在智能电网下,由于储能调度能够使传统的负荷曲线发生改变,首先在基于分时电价的基础上构建储能调度模型,对储能用户在各时段的充放电行为进行具体分析。然后由于Elman神经网络具有收敛速度慢、容易陷入局部最优等缺点,提出了一种改进的鲸鱼算法(MWOA)用于优化神经网络的权值和阈值,进一步提高了神经网络的收敛速度和全局寻优能力。最后构建考虑储能调度因素的短期负荷预测模型,通过对某地电网2018年7月至8月的数据为例进行仿真分析,并与所提到的其他预测模型进行比较。通过误差结果分析可知所提方法的预测精度更高,收敛速度更快。

    Abstract:

    There are many factors affecting the short-term load forecasting of power systems, therefore, when performing short-term load forecasting, the more types of factors are considered, the higher the accuracy of predicting is. On the basis of considering environmental factors, the improved whale algorithm optimization Elman neural network model considering the factors of energy storage scheduling under time-of-use price is constructed. Under the smart grid, because the energy storage scheduling can change the traditional load curve, firstly, based on the time-sharing price, the energy storage scheduling model is constructed to analyze the charging and discharging behavior of the energy storage users in each period. Then, because the Elman neural network has the disadvantages of slow convergence and easy to fall into local optimum, a Modified Whale Optimization Algorithm (MWOA) is proposed to optimize the weight and threshold of the neural network, which further improves the convergence and global search of the neural network excellent ability. Finally, constructing a short-term load forecasting model considering energy storage scheduling factors, the analysis of the data of a certain power grid from July to August of 2018 is carried out and compared with other prediction models mentioned. The error results analysis shows that the proposed method has higher prediction accuracy and faster convergence. This work is supported by Science and Technology Project of State Grid Corporation of China (No. SGTJDK00D WJS1700034) “Research and Application of Stochastic Power Sources Oriented Multiple Load Active Response and Predictive Control Technology”.

    参考文献
    相似文献
    引证文献
引用本文

李卫国,陈立铭,张师,等.分时电价下考虑储能调度因素的短期负荷预测模型[J].电力系统保护与控制,2020,48(7):133-140.[LI Weiguo, CHEN Liming, ZHANG Shi, et al. Short-term load forecasting model considering energy storage scheduling factors under time-sharing price (1. School of Electrical Engineering, Northeast Electric Power University, Jilin 132012, China;[J]. Power System Protection and Control,2020,V48(7):133-140]

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2019-04-16
  • 最后修改日期:2019-07-11
  • 录用日期:
  • 在线发布日期: 2020-03-30
  • 出版日期:
文章二维码
关闭
关闭