基于犹豫模糊矩阵的变电站自动化设备检修优先级决策
CSTR:
作者:
作者单位:

(1.国网湖南省电力有限公司检修公司,湖南 长沙 410000;2.湖南大学电气与信息工程学院,湖南 长沙 410000; 3.国网湖南省电力有限公司,湖南 长沙 410000;4.国网北京市电力公司综合能源服务有限公司, 北京 100000;5.国网湖南省电力有限公司常德供电公司,湖南 常德 415000)

作者简介:

彭 熹(1978—),男,硕士研究生,高级工程师,研究方向为自动化控制,智能运检和人工智能;
王佳文(1995—),女,通信作者,学士,研究方向为电力系统分析、状态检修;E-mail:wjw-hnu@foxmail.com
李振文(1987—),男,硕士研究生,高级工程师,研究方向为电力系统自动化。

通讯作者:

中图分类号:

基金项目:

国家自然科学基金项目资助(51722701)


Substation automation equipment maintenance priority decision based on hesitation fuzzy matrix
Author:
Affiliation:

(1. State Grid Hunan Maintenance Co., Changsha 410000, China;2. College of Electrical and Information Engineering, Hunan University, Changsha 410000, China;3. State Grid Hunan Electric Power Co., Ltd., Changsha 410000, China;4. State Grid Beijing Electric Power Comprehensive Energy Service Co., Ltd., Beijing 100000, China;5. State Grid Changde Power Supply Co., Changde 415000, China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    检修条件有限的情况下,检修优先级决策是合理制定检修计划及最优化检修效果的基础。综合考虑检修经济性与运行可靠性,构建优先级决策指标集并提出各个指标的量化方法,以此对检修任务的检修成本及运行风险展开量化评估。在此基础上引入基于指标相关性等因素建立的指标权重确定模型,结合反映决策者模糊意见的犹豫模糊矩阵,解决权重确定的模糊性和实时性问题。最后,通过算例对比验证了所提方法的有效性,可为调度人员合理编排检修计划提供决策依据。

    Abstract:

    The maintenance priority decision is the basis of establishing the maintenance plan and optimizing the effect of maintenance under the condition where the maintenance condition is limited. Based on the comprehensive consideration of economy of maintenance and reliability of operation, the priority decision index set is constructed. The quantitative methods of each indicator are proposed to quantitatively evaluate the maintenance cost and operational risk of maintenance task. On this basis, an index weight determination model based on the correlation between indicators is introduced. Combining index weight determination model with the hesitant fuzzy matrix reflecting the fuzzy opinions of decision makers, it can solve the fuzziness and real-time problem of determination for index weight. Finally, the effectiveness of the proposed method is verified by a comparison of examples. This method can provide decision-making basis for scheduling personnel to reasonably arrange the maintenance plan. This work is supported by National Natural Science Foundation of China (No. 51722701).

    参考文献
    相似文献
    引证文献
引用本文

彭熹,王佳文,李振文,等.基于犹豫模糊矩阵的变电站自动化设备检修优先级决策[J].电力系统保护与控制,2020,48(4):104-109.[PENG Xi, WANG Jiawen, LI Zhenwen, et al. Substation automation equipment maintenance priority decision based on hesitation fuzzy matrix[J]. Power System Protection and Control,2020,V48(4):104-109]

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2019-03-30
  • 最后修改日期:2019-07-23
  • 录用日期:
  • 在线发布日期: 2020-03-03
  • 出版日期:
文章二维码
关闭
关闭