兼顾源网安全的大规模电力外送基地多机失步保护动作策略
CSTR:
作者:
作者单位:

(1.三峡大学电气与新能源学院,湖北 宜昌 443002;2.梯级水电站运行与控制 湖北省重点实验室(三峡大学),湖北 宜昌 443002)

作者简介:

李振兴(1977—),男,博士,副教授,研究方向为电力系统继电保护与安全稳定控制;E-mail:lzx2007001@163.com
王振宇(1994—),男,通信作者,硕士研究生,主要研究方向为电力系统继电保护与安全稳定控制;E-mail:594065551@qq.com
翁汉(1980—),女,博士,高级工程师,主要研究方向为电力系统分析、继电保护与控制。E-mail:honey-weng@ 163.com

通讯作者:

中图分类号:

基金项目:

国家自然科学基金项目资助(51607106);三峡大学学位论文培优基金项目资助(2019SSPY050)


Multi-generator out-of-step protection strategy for large-scale power transmission base
Author:
Affiliation:

(1. College of Electrical Engineering and New Energy, China Three Gorges University, Yichang 443002, China;2. Hubei Provincial Key Laboratory for Operation and Control of Cascaded Hydropower Station, China Three Gorges University, Yichang 443002, China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    在大规模电力外送基地中常规能源与新能源打捆外送的趋势日趋明显。针对系统发生多机失步时,发电机安全与电网完整性对发电机失步保护要求的矛盾性,提出一种兼顾源网安全的大规模电力外送基地多机失步保护动作策略,切除最小机组保全系统稳定。立足于大规模电力外送基地多机失步的原因分析,基于等面积定则,提出多机失步下系统稳定控制策略。并从理论上分析和计算了在线路故障与负荷突变时系统稳定最优切机数,提高了系统的稳定性。最后,基于多机组并联外送系统的仿真模型验证了所提出的最小切机策略,通过功角曲线变化说明了该策略的有效性。

    Abstract:

    The trend of bundling regular and new energy has become apparent increasingly in large-scale power transmission base. There is a contradiction between the safety of generator and integrity of grid for multi-generator out-of-step protection. Therefore, multi-generator out-of-step protection action strategy is proposed for large-scale power transmission base considering the safety of both source and grid, maintaining system stability by removing the optimal unit in this paper. By analyzing the causes of multi-generator out-of-step in a large-scale power transmission base, this paper proposes a system stability control strategy under multi-generator out-of-step based on equal area criterion. The optimal cuts number of the system when line faults and loads change suddenly is analyzed and calculated theoretically, improving the stability of the system. Finally, simulation model based on delivery system of multi-unit in parallel verify the minimum cuts strategy proposed in this paper. The effectiveness of the strategy is illustrated by the change of the power angle curve. This work is supported by National Natural Science Foundation of China (No. 51607106) and Research Fund for Excellent Dissertation of China Three Gorges University (No. 2019SSPY050).

    参考文献
    相似文献
    引证文献
引用本文

李振兴,王振宇,翁汉琍,等.兼顾源网安全的大规模电力外送基地多机失步保护动作策略[J].电力系统保护与控制,2019,47(18):68-75.[LI Zhenxing, WANG Zhenyu, WENG Hanli, et al. Multi-generator out-of-step protection strategy for large-scale power transmission base[J]. Power System Protection and Control,2019,V47(18):68-75]

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2018-09-17
  • 最后修改日期:2018-11-19
  • 录用日期:
  • 在线发布日期: 2019-09-18
  • 出版日期: