应对风电功率爬坡事件备用需求分析和预防控制
CSTR:
作者:
作者单位:

(1.国网冀北电力有限公司经济技术研究院,北京 100038; 2.电网智能化调度与控制教育部重点实验室,山东大学,山东 济南 250061)

作者简介:

何成明(1986-),男,通信作者,博士,研究方向为电力系统规划技术、风力发电与并网;E-mail:sduhcm@ 163.com
杨金刚(1982-),男,博士,高级工程师,研究方向为电力系统安全稳定分析和电网规划技术;E-mail:123225054@ qq.com
王洪涛(1973-),男,博士,博士生导师,研究方向为电力系统恢复与控制、风力发电与并网。E-mail:whtwhm@ sdu.edu.cn

通讯作者:

中图分类号:

基金项目:

国家自然科学基金项目(51177092)


Reserve demand analysis and preventive control strategy to deal with wind power ramp
Author:
Affiliation:

(1. State Grid Jibei Electric Power Economic Research Institute, Beijing 100038, China;2. Key Laboratory of Power System Intelligent Dispatch and Control of Ministry of Education, Shandong University, Jinan 250061, China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对风电功率爬坡事件会严重影响系统有功平衡,甚至导致频率越限或失负荷等问题,提出一种应对风电功率爬坡事件的备用需求分析方法和预防控制策略。首先,基于序列运算理论将爬坡事件在时序上的概率预测结果转化为各时间断面上爬坡量的概率分布,并在此基础上结合风险可接受程度对系统备用需求进行了分析。然后,提出一种应对爬坡事件的预防控制策略,过程中不断根据最新的爬坡事件预测信息对调度计划进行调整,调整量包括风电场减载量、常规机组计划出力和备用容量。以含风电场的IEEE-RTS24为例对所提模型进行了仿真验证,结果表明该方法可对爬坡事件作用下系统运行风险进行准确评估,并可将风险控制在可接受范围内。

    Abstract:

    Wind power ramp event can bring serious impact on active power balance of power system, which may cause system frequency differential out-of-limit or load lost. A reserve demand analysis and preventive control model to deal with wind power ramp event is proposed to solve the above problems. Firstly, the probability distributions of wind power ramp event predication information in time series is converted to the probability distributions in single time sections based on sequence operation theory, and the reserve demand to deal with ramp event is analyzed based on it. And then, a preventive control model is proposed, the dispatching schedule is adjusted according to the newest predication information with it, and the adjustments include the curtailed amount of wind power, the output power and reserve capacity of conventional generators. The simulation results with IEEE RTS 24 system show that the proposed model can assess the operation risk of power system accurately and the operation risk can be controlled within acceptable range. This work is supported by National Natural Science Foundation of China (No. 51177092).

    参考文献
    相似文献
    引证文献
引用本文

何成明,杨金刚,王洪涛,等.应对风电功率爬坡事件备用需求分析和预防控制[J].电力系统保护与控制,2017,45(7):51-57.[HE Chengming, YANG Jingang, WANG Hongtao, et al. Reserve demand analysis and preventive control strategy to deal with wind power ramp[J]. Power System Protection and Control,2017,V45(7):51-57]

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2016-11-15
  • 最后修改日期:2017-01-03
  • 录用日期:
  • 在线发布日期: 2017-04-07
  • 出版日期:
文章二维码
关闭
关闭