国家高技术研究发展计划(863计划) (2012AA050204)
刘玉娇,王旭,蒋传文,等.采用保险机制的含风电电力系统短期备用计划的风险转移[J].电力系统保护与控制,2013,41(9):54-59.[LIU Yu-jiao, WANG Xu, JIANG Chuan-wen, et al. Insurance based risk transformation of short-term reserve plan of power system integrated wind energy[J]. Power System Protection and Control,2013,V41(9):54-59]
复制
