引用本文:胡韵华,冯瑾涛,邓清闯,等.电动汽车直流充电桩自动化测试平台的设计与应用[J].电力系统保护与控制,2021,49(7):150-159.
HU Yunhua,FENG Jintao,DENG Qingchuang,et al.Development and application of automated test platform for DC charging piles of electric vehicles[J].Power System Protection and Control,2021,49(7):150-159
【打印本页】   【下载PDF全文】   查看/发表评论  【EndNote】   【RefMan】   【BibTex】
←前一篇|后一篇→ 过刊浏览    高级检索
本文已被:浏览 7443次   下载 2133 本文二维码信息
码上扫一扫!
分享到: 微信 更多
电动汽车直流充电桩自动化测试平台的设计与应用
胡韵华,冯瑾涛,邓清闯,胡晓静
(1.许昌开普电气研究院有限公司,河南 许昌 461000;2.许昌开普检测研究院股份有限公司, 河南 许昌 461000;3.许昌许继风电科技有限公司,河南 许昌 461000)
摘要:
为了保障充电桩的安全、可靠运行,依据国家相关技术标准,研发并建立了一个多通道的自动化充电设施测试平台。该测试平台改善原来测试平台单线程、人工测试效率低,质量不能保障的问题,以保障快速发展的充电设施能够安全、可靠地投放市场。从需求分析、系统架构、硬件选型、软件设计等方面对充电桩自动化测试平台做了介绍。通过实验验证,测试平台实现了对充电设施基本功能、电气性能、通信规约、互操作性等指标的四通道并行自动化测试。
关键词:  电动汽车  充电设施  电气性能  闭环测试  互操作性  自动检测
DOI:DOI: 10.19783/j.cnki.pspc.200044
分类号:
基金项目:NSFC-河南联合基金重点支持项目资助(U1804252)
Development and application of automated test platform for DC charging piles of electric vehicles
HU Yunhua, FENG Jintao, DENG Qingchuang, HU Xiaojing
(1. Xuchang KETOP Electrical Research Institute Co., Ltd., Xuchang 461000, China; 2. Xuchang KETOP Testing Research Institute Co., Ltd., Xuchang 461000, China; 3. Xuchang Xuji Wind Power Technology Co., Ltd., Xuchang 461000, China)
Abstract:
In order to ensure the safe and reliable operation of charging piles, a multi-channel automated charging facility test platform is developed and established in accordance with relevant national technical standards. This test platform improves the single-threaded, manual test efficiency of the original test platform, and solves the problem that the problem that the quality cannot be guaranteed such that it can guarantee that the fast-developing charging facilities can remain safe and reliable on the market. This paper introduces the automated testing platform of charging piles from the aspects of requirement analysis, system architecture, hardware selection and software design. Through experimental verification, the test platform has achieved four-channel parallel automated testing of indicators such as basic functions, electrical performance, communication protocols and interoperability of charging facilities. This work is supported by the Key Support Project of NSFC-Henan Joint Foundation (No. U1804252).
Key words:  electric vehicle  charging facility  electrical performance  closed-loop testing  interoperability  automatic detection
  • 1
X关闭
  • 1
X关闭
引用本文:
【打印本页】   【下载PDF全文】   查看/发表评论  【EndNote】   【RefMan】   【BibTex】
←前一篇|后一篇→ 过刊浏览    高级检索
本文已被:浏览次   下载  
分享到: 微信 更多
摘要:
关键词:  
DOI:
分类号:
基金项目:
Abstract:
Key words:  
  • 1
X关闭
  • 1
X关闭