引用本文:张媛,覃剑,王谦,等.基于区间数灰色模糊综合评判的继电保护维修决策方法研究[J].电力系统保护与控制,2014,42(4):16-21.
ZHANG Yuan,QIN Jian,WANG Qian,et al.Research on maintenance decision-making method of relay protection based on interval numbers grey fuzzy comprehensive evaluation[J].Power System Protection and Control,2014,42(4):16-21
【打印本页】   【下载PDF全文】   查看/发表评论  【EndNote】   【RefMan】   【BibTex】
←前一篇|后一篇→ 过刊浏览    高级检索
本文已被:浏览 5355次   下载 2614 本文二维码信息
码上扫一扫!
分享到: 微信 更多
基于区间数灰色模糊综合评判的继电保护维修决策方法研究
张媛1, 覃剑2, 王谦1, 陈伟1, 张海兵1
1.国网重庆市电力公司电力科学研究院,重庆 401123;2.重庆大学通信工程学院,重庆 400044
摘要:
针对继电保护维修决策评判因素具有灰色模糊性和区间取值的特点,提出了一种基于区间数灰色模糊理论的维修决策方法。该方法在确定影响继电保护维修决策的6个主要因素的基础上,建立了包含4个维修方案的评判体系。考虑到评判因素灰部和模部间的相互影响,利用OWA(有序加权平均)算子对各方案的因素值进行集结,并对区间灰色模糊数进行运算,计算出各个方案的综合评判值,进而优选出更贴近实际的维修方案。最后以某RCS-931BM型继电保护装置及其二次回路为例进行维修方案优选,验证了该方法的可行性和有效性。
关键词:  继电保护  维修决策  区间数  灰色模糊综合评判  OWA算子
DOI:10.7667/j.issn.1674-3415.2014.04.003
分类号:
基金项目:国家高技术研究发展计划(863计划)(2011AA05A120)
Research on maintenance decision-making method of relay protection based on interval numbers grey fuzzy comprehensive evaluation
ZHANG Yuan1, QIN Jian2, WANG Qian1, CHEN Wei1, ZHANG Hai-bing1
1.Electric Power Research Institute, State Grid Chongqing Electric Power Corporation, Chongqing 401123, China;2.College of Communication Engineering, Chongqing University, Chongqing 400044, China
Abstract:
Since the evaluation factors possess grey fuzzy and interval values’ features while the maintenance decision-making of relay protection is performed, an interval numbers grey fuzzy theory based maintenance decision-making method is proposed. On the basis of deciding six principal factors of influencing maintenance decision-making of relay protection, an evaluation system including four maintenance projects is established. Considering the interaction between the grey part and fuzzy part of evaluation factors, this ordered weighted averaging (OWA) operator is used to aggregate the factor values of every project, and the interval grey fuzzy numbers are calculated, the comprehensive evaluation value of every project is worked out, then a more practical maintenance project is preferred. Taking a type RCS-931BM relay protection device and the secondary circuit for example, the optimal maintenance project is selected and the feasibility and validity of the proposed method is validated.
Key words:  relay protection  maintenance decision-making  interval numbers  grey fuzzy comprehensive evaluation  OWA operator
  • 1
X关闭
  • 1
X关闭
引用本文:
【打印本页】   【下载PDF全文】   查看/发表评论  【EndNote】   【RefMan】   【BibTex】
←前一篇|后一篇→ 过刊浏览    高级检索
本文已被:浏览次   下载  
分享到: 微信 更多
摘要:
关键词:  
DOI:
分类号:
基金项目:
Abstract:
Key words:  
  • 1
X关闭
  • 1
X关闭