A fault recovery scheme cooperating with reclosing and LVRT for active distribution network
DOI:10.7667/PSPC180210
Key Words:active distribution network  fault recovery  pre-planned islanding  DG  voltage drop
Author NameAffiliation
WANG Zhitao Laiwu Power Supply Company, State Grid Shandong Electric Power Company, Laiwu 271100, China 
WU Zhigang Laiwu Power Supply Company, State Grid Shandong Electric Power Company, Laiwu 271100, China 
GAO Houlei School of Electrical Engineering, Shandong University, Jinan 250061, China 
LI Qian School of Electrical Engineering, Shandong University, Jinan 250061, China 
Hits: 3437
Download times: 1442
Abstract:The integration of distributed generation brings great change to the operation mode of the distribution network, and higher requirements have also been set for the fault recovery scheme. By analyzing the relationship between fault reclosing and voltage variation of the distributed generation in distribution network and considering the influence of reclosing on LVRT of DG, this paper proposes a new fault recovery scheme cooperating with reclosing and Low Voltage Ride Through (LVRT) for active distribution network. The planned isolated island area is divided in advance for each DG, and different fault recovery methods are implemented according to the different fault conditions of the fault location, the isolated island area and the voltage variation of the distributed generation. The feasibility and effectiveness of the proposed scheme are verified by simulation in PSCAD. This work is supported by National Natural Science Foundation of China (No. 51377100) and Science and Technology Project of State Gird Shandong Electric Power Company (No. 52061216000M).