引用本文: | 陈卫东,姚知洋,郭 敏,等.租赁与资产转移结合的优质供电服务模式[J].电力系统保护与控制,2021,49(19):145-152.[点击复制] |
CHEN Weidong,,YAO Zhiyang,GUO Min,et al.Service pattern for premium power supply based on a combination of leasing and property transfer[J].Power System Protection and Control,2021,49(19):145-152[点击复制] |
|
摘要: |
优质供电服务模式是推进优质供电工程应用的重要内容。在现有可获得定制电力技术基础上,结合用户治理需求和治理设备的治理能力,以用户和投资者利益最大化为目标,提出一种租赁与资产转移结合的优质供电服务模式,包括了产权移交、放弃治理、继续租赁三种具体实施方案。提出优质供电服务方案优化模型,包括治理设备优化配置模型和服务方案优化模型。通过实证分析三种方案下用户与投资者的成本、收益,证明了租赁与资产转移结合模式的可行性。并进一步证明采用先租赁后资产转移的方案双方净收益最大化,为推进优质供电服务工作提供了一种可选择的模式。 |
关键词: 优质供电 服务模式 租赁与资产转移 双方利益最大化 最优方案确定 |
DOI:DOI: 10.19783/j.cnki.pspc.201081 |
投稿时间:2020-10-04修订日期:2020-12-28 |
基金项目:国家自然科学基金面上项目资助(52077145);广西电网有限责任公司科技项目资助(GXKJXM20190326) |
|
Service pattern for premium power supply based on a combination of leasing and property transfer |
CHEN Weidong,,YAO Zhiyang,GUO Min,JIN Qingren,RUAN Shiya |
(Electric Power Research Institute of Guangxi Power Grid Co., Ltd., Nanning 530023, China) |
Abstract: |
The service pattern for premium power supply is an important component of promoting the application of premium power supply engineering. On the basis of existing customised power technology, this paper presents a service pattern for premium power supply based on a combination of leasing and property transfer with the goal of maximizing the interests of users and investors. It considers the needs of users and the governance capacity of governance devices. The pattern includes three specific implementation plans, i.e. property rights transfer, abandonment of governance, and continued lease. An optimization model for service patterns for premium power supply is proposed, including an optimal configuration model for governance equipment and an optimization model for service patterns. Three specific implementation schemes are proposed. Through empirical analysis of the costs and benefits of users and investors under the three scenarios, this paper proves the feasibility of the combination of lease and property transfer. It is further shown that the scheme of leasing before property transfer maximizes both parties' income, which provides an optional mode for promoting the premium power supply service.
This work is supported by the National Natural Science Foundation of China (No. 52077145) and the Science and Technology Project of Guangxi Power Grid Co., Ltd. (No. GXKJXM20190326). |
Key words: premium power supply service pattern leasing and property transfer maximum benefits for both parties determination of optimal scheme |